Summary of estimated costs of Alterations and Additions to the Montreal Neurological Institute, June 26, 1944.
Summary of estimated costs of Alterations and Additions to the Montreal Neurological Institute, June 26, 1944.
Typewritten document summarizing the estimated costs of alterations and additions of the Field House as part of the Montreal Neurological Institute. The estimate is divided into three subsections: building alterations to be made to the Field House, Equipment [needed] based on Fifty beds, and miscellaneous equipment.
A/N 9-4/1