Preliminary Estimated Costs of Alterations and Additions to the Montreal Neurological Institute, June 26, 1944.
Preliminary Estimated Costs of Alterations and Additions to the Montreal Neurological Institute, June 26, 1944.
Typewritten document enumerating the preliminary estimated costs of alterations and additions of the Field House as part of the Montreal Neurological Institute. The estimate is divided into three subsections: building alterations to be made to the Field House, Equipment [needed] based on Forty five beds, and miscellaneous equipment.
A/N 9-4/1